Job Order Costing System


Job order costing is a method of cost accumulation and distribution used by companies that manufacture products according to customer specifications.
In a job order cost system, direct materials and direct labor are accumulated by jobs.
Factory overhead is accumulated by departments and then applied to jobs.
In essence, all factory costs are matched to the products manufactured.

Direct and indirect materials are obtained from the materials storeroom with an approved materials requisition.
Direct materials are charged to specific jobs by a debit to the work in process inventory account. Indirect materials are charged to the factory overhead control account by department and are applied to individual jobs upon completion, through a factory overhead application rate.

Labor cost (payroll) is accumulated from time cards which mechanically record total hours worked by employees on a daily basis.
Labor cost is distributed (charged) to the individual jobs in process from labor job tickets which indicate the number of direct labor hours worked on each job or indirect labor hours worked in each department, by each employee, on a daily basis.
Total labor hours and cost from job tickets should equal total labor hours and cost from time cards.

Direct labor hours/dollars are distributed to jobs by a debit to the appropriate work in process inventory account.
indirect labor hours/dollars are distributed to the appropriate departments by a debit to the factory overhead control account and later applied to individual jobs through a factory overhead application rate.

Factory overhead incurred is accumulated on a departmental factory overhead cost sheet and applied to particular jobs.

Two general types of spoilage result from the production process – normal and abnormal. The cost of normal spoilage is absorbed by good units.
Unit cost increases as a result of normal spoilage because total cost is distributed over fewer units.
(Only the good units are in the denominator in the computation of unit cost).
The cost of abnormal spoilage is removed from work in process inventory and isolated fore, the unit cost is not increased as a result of inefficient operations that cause abnormal spoilage.

Defective units ( units that are reworked) are also classified as normal and abnormal.
They are accounted for in a manner similar to normal and abnormal spoilage.

The sales value of scrap materials may be considered in the predetermined factory overhead application rate or accounted for as a credit (reduction) to the work in process inventory account.
The cost of disposting of waste may be applied either to all jobs or to specific jobs.

Operation costing is a form of job order costing in which costs are accumulated by operating or work stations and allocated to individual batches (orders).

Project costing is a form of job order costing that is commonly used to account for the cost of long term construction or service contracts.
A cost and schedule performance report is usually prepared to control and monitor the costs of a project.
A cost variance and a schedule variance are computed and included in most cost and schedule performance reports.

The factory ledger of a manufacturing firm contains only data related to manufactureing operations.
The factory ledger is tied into the general ledger through control accounts, the factory ledger account in the general ledger and the general ledger account in the factory ledger.
These control accounts are reciprocal in nature and therefore are eliminated for purpose of financial statement preparation.

Dalam sistem perhitungan biaya berdasarkan pesana ( job order costing atau job costing ), biaya produksi diakumulasikan untuk setiap pesanan ( job ) yang terpisah .
Suatu pesanan adalah output yang diidentifikasikan untuk memenuhi pesanan pelanggan tertentu atau untuk mengisi kembali suatu item persediaan.
Hal ini berbeda dengan sistem perhitungan biaya berdasarkan proses , di mana biaya diakumulasikan untuk suatu operasi atau subdivisi dari perusahaan , seperti departemen.

Akun untuk bahan baku
Akun persediaan di buku besar untuk perlengkapan, bahan baku langsung ,dan bahan baku tidak langsung bisa saja terpisah.
Praktik yang umum adalah menggunakan suatu akun buku besar berjudul Bahan Baku.

Pembelian bahan baku
Akuntansi biaya untuk pembelian bahan baku adalah sama dengan akun untuk bahan baku menggunakan sistem persediaan perpetual.
Saat bahan baku diterima, akun bahan baku didebit ( sedangkan pada sitem persediaan periodic, yang didebit adalah akun pembelian ) .

Penggunaan bahan baku
Bahan baku langsung untuk suatu pesanan dikeluarkan ke pabrik berdasarkan bukti permintaan bahan baku ( materials requisitions ) . dokumen ini dibuat oleh petugas yang menyusun jadwal produksi atau personel lain dan berisi spesifikasi mengenai nomor pesanan , tipe, serta jumlah bahan baku yang diperlukan.
Rincian dari biaya overhead juga diposting ke akun buku pembantu overhead , yang bisa berupa kertas kerja yang disebut Kertas kerja analisis overhead pabrik ( factory overhead analysis sheet )

Akun untuk tenaga kerja
Untuk mengindentifikasikan biaya tenaga kerja langsung dan tidak langsung , setiap karyawan membuat satu atau lebih Kartu jam kerja karyawan setiap Hari.
Kartu jam kerja biasanya dihitung biayanya dan diikhtisarkan secara periodik , dan jumlah kerja setiap karyawan yang tertera di kartu jam kerja dicocokkan dengan jumlah kerja menurut kartu absen .

Akun untuk biaya overhead pabrik
Overhead pabrik terdiri atas semua biaya yang tidak dapat ditelusuri langsung ke pesanan tapi terjadi dalam proses produksi ( di luar pemasaran dan administrasi ).  Biaya overhead aktual , seperti bahan baku tidak langsung dan tenaga kerja tidak langsung , dicatat pada saat terjadinya atau melalui ayat jurnal periodik .
Dasar alokasi overhead ( overhead allocation base ) , dasar alokasi yang dipilih sebaiknya merupakan aktivitas yang paling berkaitan dengan biaya yang dialokasikan : yaitu aktivitas yang tampaknya paling memicu terjadinya overhead .

Abnormal defective units : the number of defective units that exceed what is considered to be normal for an efficient operation.

Abnormal spoilage : any spotlage in excess of what is considered normal for a particular production process.
Abnormal spoilage is considered to be controllable by line or production personnel and is usually the result of inefficient operations.

Cost variance : the difference between actual cost of work performed to date and budgeted cost of work performed to date.

Defective units : units that do not meet production standards and must be reworked in order to be salable along with good units or as irregulars.

Departmental factory overhead cost sheet : a summary of factory overhead costs incurred ; it functions as a subsidiary ledger to the factory overhead control account.

Factory ledger : a ledger containing accounts that relate to manufacturing operations.

Factory ledger control : a control account in the general ledger that functions as a reciprocal account to the general ledger account.

General ledger : a ledger containing accounts that relate to the general operations of a business.

General ledger control : a control account in the factory ledger that functions as a reciprocal account to the factory ledger account.

Job order cost sheet : a summary of costs (direct materials, direct labor, and applied factory overhead) charged to a job.

Job order costing : a method of cot accumulation and distribution by jobs manufactured.

Labor job ticket : a summary of hours worked on a job by an employee.
The labor job ticket is prepared daily and is the source for labor cost distributions to jobs.

Materials requisition : a form submitted to the materials storeroom by a production department to obtain direct and indirect materials.

Normal defective units : the number of defective units in any particular production process than can be expected under efficient operations.

Normal spoilage : spoilage that would be expected in an efficient production process.

Operating costing : a form of job order costing in which costs are accumulated by operating or work stations.

Project costing : a form of job order costing used to account for long term construction or service contracts.

Schedule variance : the difference between budgeted cost of work scheduled to date and budgeted cost of work performed to date.

Scrap material : raw materials left over from the production process that can not be put back into production for the same purpose as before but may be usable for a different purpose or production process or may be sold to outsiders for a nominal amount.

Spoiled units : units that don’t meet production standards and are either sold for their salvage value or discarded.

Time card : a card used to record mechanically time in and time out for employees by insertion in a time clock. It is the source for the recording and payment of payroll.

Waste material : raw material left over after production that has no further use or resale value.

Harga pokok pesanan adalah metode akumulasi biaya dan distribusi yang digunakan oleh perusahaan-perusahaan yang memproduksi produk menurut spesifikasi pelanggan.
Dalam sistem harga pokok pesanan, bahan langsung dan tenaga kerja langsung yang dikumpulkan oleh pesanan.
overhead Pabrik di-akumulasi oleh Departemen dan kemudian diterapkan untuk pesanan.
Pada dasarnya, Semua biaya pabrik dicocokkan dengan produk yang diproduksi.

bahan-bahan Langsung dan tidak langsung Diperoleh dari gudang bahan dengan daftar permintaan bahan yang disetujui.
bahan Langsung dikenakan untuk pesanan spesifik oleh debet kepada jurnal persediaan dalam proses.
Bahan-bahan yang tidak langsung dikenai ke jurnal pabrik overhead kontrol oleh Departemen dan diterapkan untuk pekerjaan individu setelah selesai, melalui tingkat overhead aplikasi pabrik.

Biaya tenaga kerja (gaji) adalah akumulasi dari kartu waktu yang merekam mekanik total jam bekerja oleh karyawan setiap hari.
Biaya tenaga kerja didistribusikan (dikenakan biaya) untuk pesanan individu dalam proses dari tiket tenaga kerja pesanan yang menunjukkan jumlah jam bekerja tenaga kerja langsung pada setiap pesanan atau jam kerja tidak langsung bekerja di setiap departemen, oleh setiap karyawan, setiap hari.
Jam total tenaga kerja dan biaya dari Tiket pesanan harus sama dengan total jam tenaga kerja dan biaya dari kartu waktu.

Tenaga kerja langsung jam/dolar didistribusikan ke pesanan debet untuk kerja yang sesuai dalam jurnal proses persediaan.
jam kerja tidak langsung/dolar didistribusikan kepada Departemen sesuai debet ke jurnal pabrik overhead kontrol dan kemudian diterapkan untuk pesanan individu melalui tingkat aplikasi overhead pabrik.
overhead Pabrik yang dikeluarkan menumpuk di sebuah lembar Departemen biaya overhead pabrik dan diterapkan untuk pesanan tertentu.

Dua jenis umum hasil busuk dari proses produksi – normal dan abnormal.
Biaya normal busuk diserap oleh unit baik.
Biaya unit meningkatkan karena normal busuk karena total biaya didistribusikan melalui unit yang lebih sedikit.
(Hanya unit baik disebut dalam perhitungan unit biaya ).

Biaya abnormal busuk dihapus dari inventaris pesanan dalam proses dan terisolasi kedepan, biaya unit tidak meningkat sebagai hasil dari operasi tidak efisien yang menyebabkan kerugian yang abnormal.

Unit rusak (unit yang sedang dikerjakan ulang) juga diklasifikasikan sebagai normal dan abnormal.
Mereka diperhitungkan dalam cara yang mirip dengan normal dan abnormal busuk.

memo Nilai penjualan bahan dapat dipertimbangkan di tingkat aplikasi overhead pabrik telah ditetapkan atau diperhitungkan sebagai kredit (pengurangan) kepada jurnal persediaan dalam proses.
Biaya pembuangan limbah dapat diterapkan baik untuk semua pesanan atau pesanan tertentu.

Biaya operasi adalah bentuk biaya urutan pesanan di mana biaya yang dikumpulkan oleh operasi atau tempat bekerja dan dialokasikan untuk sejumlah individu (pesanan).

biaya Proyek adalah bentuk susunan pesanan biaya yang umum digunakan untuk memperhitungkan biaya konstruksi jangka panjang atau Layanan kontrak .
Biaya dan laporan jadwal kinerja biasanya disiapkan untuk mengendalikan dan memantau biaya proyek. Selisih biaya dan perbedaan jadwal dihitung dan termasuk dalam sebagian besar biaya dan laporan jadwal kinerja .

Buku besar perusahaan pabrik produksi berisi hanya data yang terkait dengan operasi produksi. Buku besar Pabrik adalah terikat ke dalam buku besar umum melalui jurnal pengendalian, jurnal buku besar pabrik di buku besar umum dan jurnal buku besar umum di buku besar pabrik .
Jurnal pengendalian Ini timbal-balik di alam dan oleh karena itu dihilangkan untuk tujuan persiapan laporan keuangan.

Unit rusak abnormal: jumlah unit rusak yang melebihi apa yang dianggap menjadi normal untuk operasi yang efisien.

Abnormal spoilage: setiap spoilage lebih dari apa yang dianggap normal untuk proses produksi tertentu. Abnormal busuk dianggap dapat dikontrol oleh personil produksi atau garis dan biasanya hasil dari operasi yang tidak efisien.

Selisih Biaya : perbedaan antara biaya pesanan yang sebenarnya dilakukan untuk waktu dan biaya pesanan yang dianggarkan untuk waktu tersebut.

Unit rusak: unit yang tidak memenuhi standar produksi dan dikerjakan ulang agar laku bersama dengan unit baik atau sebagai pesanan yang tidak ditentukan.

lembar Departemen biaya overhead pabrik : ringkasan dari biaya overhead pabrik yang dikeluarkan; ini berfungsi sebagai buku besar tambahan ke jurnal pengendalian overhead pabrik.

Buku besar Pabrik : buku besar yang mengandung jurnal yang berhubungan dengan operasi produksi.

Buku besar pengendalian Pabrik : jurnal pengendalian di buku besar umum yang berfungsi sebagai jurnal timbal balik ke jurnal buku besar uMum.

Buku besar umum : buku besar yang mengandung jurnal yang berhubungan dengan operasi bisnis umum .

Pengendalian buku besar umum : jurnal pengendalian di buku besar pabrik yang berfungsi sebagai jurnal timbal balik ke jurnal buku besar pabrik .

lembar biaya pesanan pokok : Ringkasan biaya (bahan langsung , tenaga kerja langsung, dan pabrik overhead terapan) dikenakan untuk pesanan.

Harga pokok pesanan : metode menggunakan akumulasi biaya dan distribusi oleh pesanan yang diproduksi.

Tiket pesanan Tenaga kerja : ringkasan dari jam bekerja pada pesanan oleh karyawan.
Tiket Pesanan buruh siap setiap hari yang adalah sumber biaya tenaga kerja distribusi untuk pesanan.

Daftar bahan-bahan permintaan: formulir dikirimkan ke gudang bahan oleh Departemen produksi untuk mendapatkan bahan-bahan yang langsung dan tidak langsung.

Unit rusak normal: jumlah unit yang cacat dalam proses produksi tertentu dari yang dapat diharapkan dalam operasional yang efisien.

Normal busuk: busuk yang diharapkan dalam proses produksi yang efisien.

biaya Operasi : bentuk susunan biaya pesanan di biaya yang dikumpulkan oleh operasi atau tempat kerja.

biaya Proyek : bentuk urutan biaya pesanan digunakan untuk memperhitungkan konstruksi jangka panjang atau Layanan kontrak .

Perbedaan Jadwal : perbedaan antara jadwal tanggal kerja biaya dianggarkan dan biaya pesanan dianggarkan yang dilakukan untuk waktu tertentu.

Memo bahan: bahan baku yang tersisa dari proses produksi yang tidak akan dimasukkan kembali ke dalam produksi yang sama tujuan seperti sebelumnya tapi mungkin dapat digunakan untuk proses tujuan atau produksi yang berbeda atau dapat dijual ke luar untuk jumlah nominal.

Unit rusak : unit yang tidak memenuhi standar produksi dan nilai penyelamatan baik mereka dijual atau dibuang.

kartu Waktu : kartu yang digunakan untuk merekam mekanis waktu untuk karyawan oleh penyisipan di jam waktu. Ini adalah sumber untuk rekaman dan pembayaran gaji.

bahan terbuang : bahan baku yang tersisa setelah produksi yang tidak memiliki penggunaan lebih lanjut atau nilai dijual kembali .

N.b : translatenya rempong, jangan ikut lurus” yee!!!

Posted from WordPress for BlackBerry Novia.

One thought on “Job Order Costing System

Leave a Reply for Novia

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s